Single-phase or three-phase? Here’s how to tell

For a heat pump, induction hob or EV charger it matters how heavy your connection is. You can see it yourself in seconds.

⚠️ Safety first: the cover of the consumer unit (meterkast) stays closed. Everything below is done by looking and using the buttons meant for you. In doubt, smell burning or feel heat? Switch off and call an electrician.

Step by step

Single or three-phase?

Step 1

Look at the main switch

At the top or next to the circuits. A narrow one with one or two poles is usually single-phase; a wide one with three or four poles usually three-phase.

Step 2

Check your meter or energy bill

It shows your connection, for example 1x35A (single-phase) or 3x25A (three-phase).

Step 3

Count the phases in the unit

With three-phase the circuits are split over L1, L2 and L3 — often written on the circuit labels.

Good to know

And then?

A 1x35A connection gives about 8 kW. A 3x25A connection about 17 kW, spread over three phases — enough for heat pump, induction and EV charger at the same time.
Often with an all-electric heat pump, a fast EV charger or many heavy appliances at once. A hybrid heat pump usually works on single-phase.
The grid operator (in Limburg: Enexis) changes the connection and meter. I prepare the meter cupboard and replace or adapt the consumer unit.

Read also: Is your consumer unit heat-pump ready? →  ·  All guides →

Not sure what you need?

Send a photo of your consumer unit and your plans. I’ll tell you honestly if single-phase is enough.