Energy · Heat pump

Heat pump installation — from design to execution

From the design of a new installation through to the execution of the project: I take care of your heat pump end to end — matched with your solar panels, home battery and EV charger. Qualified Heat Pump Work Supervisor, registered in the Centraal Register Techniek. In Sittard, Maastricht and across Limburg, explained in English.

My mission

A home ready for the future — and for European standards.

I’m Diana. I do the work myself, from the first measurement to the last screw, and I explain everything calmly — in English, Italian or Dutch. My background is in construction and electrical engineering, so I don’t look at one appliance, but at your whole home.

My mission follows the EU buildings directive (EPBD) and its goal of zero-emission buildings (ZEB): from 2030 all new buildings in the EU must be zero-emission, and existing homes will be made sustainable step by step. I help you get ready for that today — without unnecessary costs and without surprises.

That’s why I offer advice on every aspect of your home: electrics and consumer unit, heating and heat pump, solar panels and home battery, EV charging, ventilation and renovation. Honest advice — even when the answer is: you don’t need this (yet).

— Diana Ignatiuc

The complete package

Heat pump, solar, battery and EV charger — one design, one point of contact.

🔥 Heat pump

Hybrid or all-electric: sizing, placing, connecting, commissioning and maintenance.

☀️ Solar panels

SOLARWATT solar panels, certified partner: your own power for your heat pump. About SOLARWATT →

🔋 Home battery

Store your solar power and use it in the evening — for the heat pump too. SOLARWATT batteries →

🚗 EV charger

Charge your car on your own power, on a dedicated circuit and a consumer unit that can cope. Energy solutions →

How I work

1. Design

I look at your home, usage and consumer unit and design the new installation.

2. Quote

A clear, fixed-price quote with a schedule.

3. Execution

I carry out the project: placing, connecting, consumer unit and all electrics.

4. Handover & maintenance

Commissioning, explanation, documentation — and maintenance afterwards.

The service

Ready for your heat pump — starting at the meterkast.

From consumer unit to heat pump

The problem

A new heat pump, but an old consumer unit with no space, no dedicated circuit or only a 500 mA RCD. The installer has to wait — or the connection becomes guesswork.

What's included
  • Check of your consumer unit and supply capacity (single-phase or 3x25A)
  • Dedicated circuit with RCBO for the outdoor and indoor unit
  • If needed, replace or extend the consumer unit, or request 3-phase from the grid operator
  • Supply cable and neat cable route to the outdoor unit
  • Integration with your solar panels and SOLARWATT system
  • Testing, handover and documentation
What you get

A safe, tested connection your heat-pump installer can work on straight away — or I install the heat pump myself.

What I do for you

Everything from one person.

⚡ Available now

Electrical connection

Dedicated circuit, RCBO, supply to the outdoor unit and, where needed, a new consumer unit — also for hybrid heat pumps next to your boiler.

🧭 Available now

Advice first

Can your home take a heat pump? I look at your consumer unit, solar panels and usage, and tell you honestly whether hybrid or all-electric suits you.

☀️ Available now

Together with your solar panels

Heat pump, solar panels, home battery and charger working together, so you heat with as much of your own power as possible.

🔥 Available now

Complete installation

Hybrid or all-electric (air-to-water, monobloc): I place the heat pump, connect it hydraulically and electrically, commission it and hand everything over properly. Maintenance too.

From the job

Consumer unit replaced — ready for the hybrid heat pump.

A 35-year-old unit with only 500 mA RCD protection, replaced by a new ABB consumer unit with main switch, everything behind 30 mA and a dedicated RCBO circuit for the hybrid heat pump. See the project →

Service area: Sittard, Geleen, Maastricht, Heerlen, Beek, Stein, Born, Susteren, Roermond and the rest of Limburg. Everything explained in English — including the Dutch paperwork.

Frequently asked questions

Heat pumps and electrics — good to know.

It depends on your supply and consumer unit. A hybrid heat pump often fits on a normal supply with a dedicated circuit; an all-electric one usually needs more capacity and sometimes 3-phase. I check first and tell you honestly what’s needed.
Yes. I’m a qualified Heat Pump Work Supervisor and install air-to-water (monobloc) and hybrid heat pumps end to end: advice, placing, hydraulic and electrical connection, commissioning and maintenance. In a monobloc unit the refrigerant circuit is sealed at the factory, so no refrigerant work is needed on site.
Yes. If you already have an installer for the heat pump, I prepare the consumer unit and do the electrical connection so they can carry on straight away.
It depends on what’s already there: just an extra circuit, or a new consumer unit. Send a photo of your meterkast via WhatsApp for an indication, and get a fixed price after the on-site check.
Yes, in most cases. You apply for the ISDE yourself at RVO, after installation. The condition is that an installation company does all of the work — preparation, installation, finishing and commissioning — and that’s what I do. You get an invoice from me with brand, model and installation date, and I help you with the heat pump’s meldcode. For a (hybrid) heat pump the subsidy is at least € 500; the exact amount depends on the model. Note: the ISDE applies to homes built before 2019.

Related

Energy solutions  ·  Home automation  ·  New build & 3-phase  ·  All services  ·  Contact

Heat pump on the way?

Send a photo of your consumer unit and the heat-pump model. You’ll quickly get an honest indication of what’s needed.