Services · New build & 3-phase

Electrical installation for new homes — 3-phase and future-ready

Building a new home or doing a major renovation? I install the complete electrical system to NEN 1010 on a 3-phase supply (3x25A, 400V) — ready from day one for a heat pump, induction hob, EV charger, solar panels and home battery. In Sittard, Maastricht and across Limburg, explained in English.

My mission

A home ready for the future — and for European standards.

I’m Diana. I do the work myself, from the first measurement to the last screw, and I explain everything calmly — in English, Italian or Dutch. My background is in construction and electrical engineering, so I don’t look at one appliance, but at your whole home.

My mission follows the EU buildings directive (EPBD) and its goal of zero-emission buildings (ZEB): from 2030 all new buildings in the EU must be zero-emission, and existing homes will be made sustainable step by step. I help you get ready for that today — without unnecessary costs and without surprises.

That’s why I offer advice on every aspect of your home: electrics and consumer unit, heating and heat pump, solar panels and home battery, EV charging, ventilation and renovation. Honest advice — even when the answer is: you don’t need this (yet).

— Diana Ignatiuc

The complete package

Heat pump, solar, battery and EV charger — one design, one point of contact.

🔥 Heat pump

Hybrid or all-electric: sizing, placing, connecting, commissioning and maintenance. About heat pumps →

☀️ Solar panels

SOLARWATT solar panels, certified partner: your own power for your heat pump. About SOLARWATT →

🔋 Home battery

Store your solar power and use it in the evening — for the heat pump too. SOLARWATT batteries →

🚗 EV charger

Charge your car on your own power, on a dedicated circuit and a consumer unit that can cope. Energy solutions →

How I work

1. Design

I look at your home, usage and consumer unit and design the new installation.

2. Quote

A clear, fixed-price quote with a schedule.

3. Execution

I carry out the project: placing, connecting, consumer unit and all electrics.

4. Handover & maintenance

Commissioning, explanation, documentation — and maintenance afterwards.

An all-electric home starts at the consumer unit

The problem

A new home is all-electric: no gas, but a heat pump, induction hob, EV charger and solar panels. A consumer unit that’s too small or too few circuits means breaking walls later, extra cost and an installation that can’t quite cope.

What’s included
  • Circuit layout design and a clear 3-phase consumer unit
  • Conduits and boxes during the shell stage: walls, floors and ceilings
  • Dedicated circuits for heat pump, induction hob, EV charger, inverter and home battery
  • RCBOs and earthing, surge protection where needed
  • Second fix: switches, sockets, lighting and data
  • Final inspection, test report and documentation for your handover file
What you get

A safe, tested installation that already handles what your home will ask of it in the years ahead — without breaking walls later.

What I do for you

From shell to handover.

⚡ Available now

Complete new build

The full electrical installation of your new home, coordinated with your builder: conduits in the shell stage, second fix after plastering.

⚡ Available now

Single-phase to 3-phase

Existing home at its limit? I prepare the meter cupboard and replace or adapt the consumer unit; the grid operator changes the connection itself.

⚡ Available now

Major renovation & extension

New kitchen with induction, extension or loft: extra circuits and a consumer unit that can handle it all.

⚡ Available now

Everything working together

Heat pump, solar panels, home battery and EV charger in one design — so you run on your own power as much as possible.

FAQ

New builds and 3-phase — good to know.

Because an all-electric home asks for a lot at once: heat pump, induction cooking and an EV charger. A 3x25A supply gives about 17 kW spread over three phases; a standard single-phase 1x35A supply about 8 kW. With 3-phase you spread the load and keep room for the future.
Usually, yes. The grid operator changes the connection and meter; I prepare the meter cupboard and replace or adapt the consumer unit. I’ll tell you up front exactly what’s needed.
Yes. I plan alongside the build: conduits and boxes during the shell stage, second fix after plastering, and I supply the documentation for the handover file.
It depends on the size of the house and what you want. Send your drawings or floor plan and you’ll get a fixed-price quote.

Related

Heat pump  ·  Energy solutions  ·  All services  ·  Contact

Building or renovating?

Send your drawings or a photo of your meter cupboard. You’ll quickly get an honest indication, then a fixed-price quote.